User Story: As a construction engineer, I need Lunar Rover X to fully charge at the end of each day, so that I can use for x number of hours the next day.

  • From this, we can infer that Lunar Rover X needs to dock to a common power source/power service provider to recharge its onboard battery.
    • Who's providing power?
    • What interface/design does Rover X need to have in order to recharge? 
  • Can we align mission plans with optimal times for power consumption? E.g. If rovers always need to charge regularly, can we time charge times to moments of low draw/high solar availability?

Primary Focus Area: Power
Secondary Focus Areas: Robotics, Communications


  File Modified
Microsoft Excel Spreadsheet Wired Rover Charge Use Case Tracking.xlsx Apr 30, 2024 by Shin, Anna K. F.
Microsoft Excel Spreadsheet Use Case 2 07May2024.xlsx May 07, 2024 by Shin, Anna K. F.

Attachments:

Wired Rover Charge Use Case Tracking.xlsx (application/vnd.openxmlformats-officedocument.spreadsheetml.sheet)
Use Case 2 07May2024.xlsx (application/vnd.openxmlformats-officedocument.spreadsheetml.sheet)